SR 82 Continuous Flow Intersection

$55 Million FDOT Contract Widened 2 to 6 lanes 80,000 tons of asphalt

Transformed a perilous 5-mile stretch of Florida road from two lanes to six lanes, featuring the state's inaugural Continuous Flow Intersection (CFI). Employed advanced GPS technology for precise construction, including subgrade, base, asphalt, and over 100,000 LF of curb and gutter without stakes. Utilized 80,000 tons of asphalt in the reconstruction process.