67,000 tons of asphalt
SR 56 from Meadow Pointe Blvd to US 301 in Wesley Chapel, FL. The project includes the section of SR 56 starting at the intersection with Meadow Point Blvd ending at the cross with US 301. 67,000 tons of mix were placed approximately. 3 inches of Structural course were placed, topped with 0.75 inches of FC-5 friction course. This job had a 1.02 pay factor on the asphalt mix due to its great results. It had a 4.1 Ride number.